[Previous entry: "Layup"] [Next entry: "Edging and stringers"]
02/15/2017: "The flip"
With this inside laid up we flipped the top, position and checked the curve with the template for the jig and prepare for the top layup.
[Previous entry: "Layup"] [Next entry: "Edging and stringers"]
With this inside laid up we flipped the top, position and checked the curve with the template for the jig and prepare for the top layup.