[Previous entry: "Foam onto jig"] [Next entry: "Layup"]
02/15/2017: "Preparing for initial glass layup"
The foam was nailed down with small bullet head nails to the jig. These will pull through once we have glassed the inside of the roof.
[Previous entry: "Foam onto jig"] [Next entry: "Layup"]
The foam was nailed down with small bullet head nails to the jig. These will pull through once we have glassed the inside of the roof.